Which controls should be ready?

Illustrative example. Confirm the contract edition, document index, amendments, technical scope, programme assumptions and review owners.

Contract review intake
ControlEvidence
FormNamed contract and edition
PackIndex of schedules, drawings and amendments
ScopeTechnical responsibilities and interfaces
AssumptionsPrice and programme dependencies
ReviewContracts, legal and engineering owners

What is outside the tool?

It is a preparation aid only. It does not give legal advice or perform engineering sign-off.

This is a document-control guide, not legal advice. A contracts professional and qualified legal adviser must decide the contractual position.

Common questions

What else should the bid team know?

Is this legal advice?

No. It is a document-control checklist only.

Are selections stored?

No. Checklist selections remain in the browser.

Who approves the final position?

The bidder's contracts and legal advisers, with responsible engineering review for technical matters.

Primary sources

  1. NEC4 contract familiesNEC Contracts
  2. Plant and Design-Build Contract, Second Edition, 2017FIDIC
  3. Contract standards and current editionsStandards Australia